sTGC fabrication update 30/05/2018

  • Gluing of #Module 2 cuadruplet (Finished)Gluing of rulers p1002 & p40034
  • Soldering of ground cables for p1 & p2
  • Testing and washing of strip for p10029 chamber closing
  • 19 point measurements with p20010 strip rulers
  • WhatsApp Image 2018-05-30 at 4.38.38 PM WhatsApp Image 2018-05-30 at 4.31.51 PM WhatsApp Image 2018-05-30 at 4.31.50 PM (1)

 

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply