Activity in school. Cosmic ray Telescope

Since October 2018, school students from ‘Colegio Altamonte’ have been taking measurements using the Cosmic Ray Telescope that was developed as part of the ACT 1406 Anillo project. After one month of measurements they gave a presentation with their results. 8 different students also gave presentations about different subjects related to cosmic rays.

IMG-20181129-WA0005

More pictures regarding this activity can be found in the Gallery section of the webpage.

Activity in school. ATLAS Coloring book for kids

On Decmeber 12, as part of the anillo ACT 1406 project, 3 talks were given in one of Viña del Mar’s most emblematic schools, Colegio Winterhil. The talks were given to groups of young kids (7yo – 9yo)  and were about the ATLAS Experiment. As part of the activity, a coloring book about the ATLAS experiment was given to each one of the kids. It was a great success and the kids seemed to be very interested about science and the particles of the Universe.

A gallery with pictures can be found in the following link: https://lhc.institutosaphir.cl/portfolio-item/activity-in-school-atlas-book-for-kids/

 

IMG-5572

OLYMPUS DIGITAL CAMERA

OLYMPUS DIGITAL CAMERA

1st Workshop about electronics for detectors

A succesful workshop about the electronics inside particle detectors was conducted at UTFSM, where Professor Serguei Kuleshov (Phd), who is director of the Anillo Project ACT1406, was the main speaker, giving  a talk about Electronics in High Energy Physics of Nuclear Electronics.

afiche

Jornada de difusión científica

El día martes 4 de Septiembre, se realizó una jornada de difusión científica a través del proyecto anillo ACT 1406, donde alumnos del colegio Altamonte visitaron el Laboratorio de Detección de partículas del la UTFSM. Se les realizó una guía de todo el laboratorio y se hizo una presentación del Telescopio de rayos cósmicos, con con el cual estarán trabajando durante los próximos meses como parte del área de difusión del proyecto anillo.

El evento fue resaltado por la prensa, como se puede ver en el siguiente artículo:

http://www.estrellavalpo.cl/impresa/2018/09/20/full/cuerpo-principal/9/

De igual forma, también fue resaltado en la página de la UTFSM:

http://www.noticias.usm.cl/2018/09/24/usm-entrega-telescopio-de-rayos-cosmicos-a-colegio-de-la-v-region/

 

IMG_4616

IMG_4612

sTGC fabrication update 01/06/2018

  • Winding of cathodes p40034 & p20019
  • Gluing of rulers and buttons for pad p1002
  • Current testing for chamber p40052
  • 19 points measurement for cathode p40034
  • Module #2 sent to PUC, Santiago.
  • Polishing of strip p4022

WhatsApp Image 2018-06-01 at 4.57.38 PM (3) WhatsApp Image 2018-06-01 at 4.57.36 PM (1)

WhatsApp Image 2018-06-01 at 4.59.03 PM (4)

sTGC fabrication update 23/05/2018

  • Current testing for chamber p3 0058
  • Alignment and gluing of doublet p1 -2 0027 0011
  • Winding and soldering of p4 0058 and p3 0058
  • Measurements for p4 0069 chamber
  • WhatsApp Image 2018-05-23 at 3.17.57 PM (1) WhatsApp Image 2018-05-23 at 3.17.58 PM (1) WhatsApp Image 2018-05-23 at 3.17.59 PM (3)

sTGC fabrication update 17/05/2018

  • Gluing of rulers – cathodes p3
  • Polishing of strips
  • Measurements of 19 points, width of cathodes plus rulers pad p4
  • Winding of pad p4
  • Beginning of soldering pad p3
  • Width measurement for chamber p4 0069
  • Sanding of honeycomb for doublet

WhatsApp Image 2018-05-17 at 10.59.44 AM WhatsApp Image 2018-05-17 at 4.57.28 PM (2) WhatsApp Image 2018-05-17 at 4.57.27 PM (3)

sTGC fabrication update 16/05/2018

  • Selection of rulers
  •  Gluing and polishing of cathodes p3 0013 and p4 0013
  • Polishing of cathodes p3 0013 and p4 0013
  • Winding of cathodes p3 and p4
  • Covering of rulers with plastik
  • Chamber p3 0071 closed
  • Official data base updated vía dropbox

WhatsApp Image 2018-05-16 at 5.07.03 PM WhatsApp Image 2018-05-16 at 5.02.31 PM (1) WhatsApp Image 2018-05-16 at 5.02.30 PM (1)

sTGC fabrication update 15/05/2018

– Current testing for p3_8 0071 chamber
– Gluing of plastik for rulers and sanding of honeycomb framse for doublet p120027-0011 for module 2
WhatsApp Image 2018-05-15 at 11.16.21 AM WhatsApp Image 2018-05-15 at 11.16.20 AM WhatsApp Image 2018-05-15 at 11.16.19 AM

sTGC fabrication update 14/05/2018

– Chamber P2 0026 closed
– Winding of P3 0058
– Gluing of rulers P4 0052 and doublets P1 0027 P 0011

WhatsApp Image 2018-05-14 at 5.37.33 PM

WhatsApp Image 2018-05-14 at 5.37.33 PM (2)

WhatsApp Image 2018-05-14 at 5.37.33 PM (1)