sTGC fabrication update 01/06/2018

  • Winding of cathodes p40034 & p20019
  • Gluing of rulers and buttons for pad p1002
  • Current testing for chamber p40052
  • 19 points measurement for cathode p40034
  • Module #2 sent to PUC, Santiago.
  • Polishing of strip p4022

WhatsApp Image 2018-06-01 at 4.57.38 PM (3) WhatsApp Image 2018-06-01 at 4.57.36 PM (1)

WhatsApp Image 2018-06-01 at 4.59.03 PM (4)

sTGC fabrication update 31/05/2018

  • Closing of chamber p10029
  • 19 points measurement for Module#2 cuadruplet
  • Gluing of ruler cathode p10002
  • X-ray scan of p1 chamber for Module #3 cuadruplet
  • Selection of rulers for p1, p3 & p4 strips
  • Reaparing of chambers with electrical failures. Further testing

WhatsApp Image 2018-05-31 at 5.18.57 PM WhatsApp Image 2018-05-31 at 5.18.59 PM (2) WhatsApp Image 2018-05-31 at 5.18.33 PM

sTGC fabrication update 30/05/2018

  • Gluing of #Module 2 cuadruplet (Finished)Gluing of rulers p1002 & p40034
  • Soldering of ground cables for p1 & p2
  • Testing and washing of strip for p10029 chamber closing
  • 19 point measurements with p20010 strip rulers
  • WhatsApp Image 2018-05-30 at 4.38.38 PM WhatsApp Image 2018-05-30 at 4.31.51 PM WhatsApp Image 2018-05-30 at 4.31.50 PM (1)

 

sTGC fabrication update 29/05/2018

  • Soldering and winding of p1 & p2
  • 19 point measurements for cathodes p20003 & p30063
  • Ruler selection for cathodes p10002
  • Ruler gluing for cathodes p0054 & p20010
  • 19 point measurement and angularity test for Module#2 cuadruplet
  • Gluing of protection layers of module#2 cuadruplet
  • Improvement of CO2 and N-pentane tubes in X-ray test room

WhatsApp Image 2018-05-29 at 3.54.23 PM (2) WhatsApp Image 2018-05-29 at 3.54.22 PM WhatsApp Image 2018-05-29 at 3.54.22 PM (2)

sTGC fabrication update 28/05/2018

  • WhatsApp Image 2018-05-29 at 3.49.13 PMGluing of ruler for cathodes p20003 & p30063
  • Pictures taken for the alignment of module #2 cuadruplet
  • Current testing for chamber p10029